
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
LATEST POSTS
- 1
Extremely Rare Snub-Nosed Monkey Was Just Born for the First Time Outside of Asia - 2
Unwinding the Starting points of America: An Excursion Through History - 3
Which sandwich do you find totally delectable? ! - 4
SpaceX shatters its rocket launch record yet again — 165 orbital flights in 2025 - 5
2024 Manual for Light Extravagance Room Feel: What's Moving
Trump said affordability is a ‘hoax’ in his Pennsylvania speech. What do the latest numbers show?
This St Nick Truly Can Advise How To Drink And Hack Your Headache
Vote in favor of your Favored sort of footwear
UK clothing inflation climbs as Middle East turmoil threatens wider price rises
She's been a Bond girl and a mutant. Now she's grappling with Hollywood's obsession with 'eternal youth.'
America's Confided in Cooler in 2024
Osteoporosis, the silent disease, can shorten your life − here’s how to prevent fractures and keep bones healthy
Woman gives birth on roadside after hospital allegedly sent her home: Family
Germany's Merz under fire in Brazil for his comments on Amazon host city of COP30













